Standard Process is doing some construction at their site on the south side of the end of Run Way 27.
There is an Obstruction NOTAM posted about the possible presence of a crane from September 1 through Dec 31, 2023.
Type B Notice of 2023 Spring Election: Sample ballots Type B Notice of 2023 Spring Election
Standard Process is doing some construction at their site on the south side of the end of Run Way 27.
There is an Obstruction NOTAM posted about the possible presence of a crane from September 1 through Dec 31, 2023.